Search results
Results from the WOW.Com Content Network
The Desert Hawk III was created by the Skunk Works team at Lockheed Martin as an update to the original Desert Hawk, which was developed in 2002 with its first actual flight coming in 2003. The original is slightly smaller and heavier than the DHIII, and the DHIII can stay in the air over thirty minutes longer.
The M142 High Mobility Artillery Rocket System (HIMARS, / ˈ h aɪ m ɑːr z /) is a light multiple rocket launcher developed in the late 1990s for the United States Army and mounted on a standard U.S. Army Family of Medium Tactical Vehicles (FMTV) M1140 truck frame.
Lucent became a "darling" stock of the investment community in the late 1990s, and its split-adjusted spinoff price of $7.56/share rose to a high of $84. Its market capitalization reached a high of $258 billion, and it was at the time the most widely held company with 5.3 million shareholders.
One of Sandia's first permanent buildings (Building 800) was completed in 1949. Sandia National Laboratories' roots go back to World War II and the Manhattan Project.Prior to the United States formally entering the war, the U.S. Army leased land near an Albuquerque, New Mexico airport known as Oxnard Field to service transient Army and U.S. Navy aircraft.
Lockheed Martin UK Limited (LMUK) is a wholly owned subsidiary of Lockheed Martin, headquartered in London. The company was created on 1 July 1999, combining all of ...
The Ajax is manufactured and designed by General Dynamics UK and General Dynamics Santa Bárbara Sistemas (Spain), with the new turret and fire control system fitted on the Reconnaissance variant being designed and manufactured by Lockheed Martin UK. Lockheed Martin is working closely with the Defence Support Group for turret manufacture and ...
In April 2012, Lockheed Martin received a $79.4 million contract to develop a GMLRS incorporating an Alliant Techsystems-designed alternative warhead to replace DPICM cluster warheads. The AW version is designed as a drop-in replacement with little modification needed to existing rockets.
On 23 August 2012, the JLTV program selected Lockheed and two other companies as winners of the Engineering and Manufacturing Development (EMD) phase of the program. Lockheed won a contract to produce 22 prototype vehicles in 27 months for evaluation. [15] The Lockheed JLTV family underwent a design understanding review from 18–20 December 2012.